Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
1
/
of
6
MODUS
GPS Tracker for Dogs, 2 in 1 Pet Tracking Smart Collar (Only iOS), No Monthly Fee GPS Tracker Dog Collar, Real-time Location Comfortable PU Tracker Tag for Small, Medium Large Dogs(Locator Included)
GPS Tracker for Dogs, 2 in 1 Pet Tracking Smart Collar (Only iOS), No Monthly Fee GPS Tracker Dog Collar, Real-time Location Comfortable PU Tracker Tag for Small, Medium Large Dogs(Locator Included)
Regular price
$52.78 USD
Regular price
$52.78 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Overview
- Color : Orange Gps Dog Tracker Collar
- Brand : MODUS
- Included Components : GPS Tracker, manual, pet collar
- Number of Items : 2
- Manufacturer : MODUS
About this item
- 🔴✔️No Additional Product Fees – This device operates without any subscription or monthly service fees charged by the manufacturer. iOS users can pair it directly with Apple’s built-in “Find My” app.
- 🔴✔️ Real-Time Tracking & Location History - With this 2-in-1 GPS dog tracker collar, you won’t have to worry about your furry friend going out of sight, even if they wander off or get lost. Our live tracking collar lets you quickly and easily locate them. You can also see where your buddy has been and what they’ve been up to with this tracker. If you have any further questions, feel free to reach out to us!
- 🔴✔️ Adjustable Pet Collar Size - The MODUS dog tracking collar is designed for easy customization to fit your dog’s neck perfectly. Simply measure and cut it to the desired length. It's suitable for medium and large dogs.
- 🔴✔️ Lightweight, Durable & Waterproof Pet Finder - The dog tracker is crafted from nylon with a smooth PU surface for a sleek appearance. Plus, it is IP67 waterproof, so you don’t have to worry about rain, mist, snow, or water. This design helps extend the device's lifespan.
- 🔴✔️ Anti-Lost Function & Works with Apple Find My App - If your pet wanders off while playing outside, your iPhone, Apple Watch, iPad, or Mac will alert you when it’s detected in the Find My network. This feature helps prevent your pet from getting lost or stolen.
Share
